DOWNLOAD INSTRUCTIONS - You will need Adobe Acrobat Reader 6 or greater to view the PDF files available on this page. Older versions may not be able to properly view these documents.
Due to the large file sizes of these documents a broadband connection is recommended for download.
RECORD OF DECISION (July 5, 2006)
- Table of Contents
- Chapter 1 - Decision
- Chapter 2 - Alternatives Considered
- Chapter 3 - Measures to Minimize Harm
- Chapter 4 - Monitoring and Reporting
- Chapter 5 - Comments on the Final EIS
- Chapter 6 - Record of Decision
Exhibits
FINAL ENVIRONMENTAL IMPACT STATEMENT (April 13, 2006)
- Executive Summary (PDF – 638 KB)
- ES.1 Introduction
- ES.2 Project Description
- ES.3 Purpose and Need
- ES.4 Alternatives
- ES.5 Summary of Impacts and Selection of Preferred Alternative
- ES.6 Local Road Improvement Projects
- ES.7 Mitigation Measures
- ES.8 Major Issues Raised in Agency and Public Comments
- ES.9 Other Federal Actions Required for the Proposed Action
- Chapter 1 - Project Introduction (PDF – 362 KB)
- Chapter 2 - Purpose and Need (PDF – 215 KB)
- Chapter 3 - Alternatives (PDF – 3.11 MB )
- 3.1 Preliminary Alternatives Analysis and Screening
- 3.2 Modifications of Alternatives Recommended For Further Analysis
- 3.3 Description of the Alternatives Selected for Detailed Study
- 3.4 Identification of Alternatives Studied Further
- 3.5 Local Road Improvements
- 3.6 Selection of the Preferred Alternative
- Chapter 4 - Affected Environment (PDF – 2.69 MB)
- 4.1 Traffic and Transportation
- 4.2 Pedestrian and Bicyclist Access
- 4.3 Socio-economic Environment
- 4.4 Community Facilities and Services
- 4.5 Farmland
- 4.6 Historic and Archaeological Resources
- 4.7 Air Quality
- 4.8 Highway Noise
- 4.9 Natural Resources
- 4.10 Water Resources
- 4.11 Floodplains
- 4.12 Wetlands
- 4.13 Visual and Aesthetic Resources
- 4.14 Hazardous Material Sites
- Chapter 5 - Environmental Consequences (PDF – 2.72 MB)
- 5.1 Traffic and Transportation
- 5.2 Pedestrian and Bicyclist Access
- 5.3 Social/Economic Impacts
- 5.4 Community Facilities and Services
- 5.5 Farmland
- 5.6 Historic and Archaeological Resources
- 5.7 Air Quality Impacts
- 5.8 Highway Noise
- 5.9 Natural Resources
- 5.10 Water Resources
- 5.11 Floodplains
- 5.12 Wetlands
- 5.13 Visual and Aesthetic Resources
- 5.14 Hazardous Materials Sites
- 5.15 Energy Impacts
- 5.16 Construction Impacts
- 5.17 Permits
- 5.18 Short Term Uses of Environment Versus Long Term Productivity
- 5.19 Irreversible and Irretrievable Commitment of Resources
- 5.20 Indirect and Cumulative Impacts
- Chapter 6 – Mitigation (PDF – 1.16 MB)
- 6.1 Relocation Assistance
- 6.2 Historic and Archaeological Resources Mitigation
- 6.3 Air Quality
- 6.4 Noise Impacts
- 6.5 Farmland
- 6.6 Wetland Mitigation
- 6.7 Mitigation of Visual Impacts and Aesthetics
- 6.8 Construction
- 6.9 Design
- 6.10 Ecosystem Impacts
- 6.11 Threatened & Endangered Species Impact
- 6.12 Hazardous Material Site Mitigation
- Chapter 7 - Draft Section 4(f) Evaluation (PDF – 557 KB)
- Chapter 8 - Public Outreach, Comments and Coordination (PDF – 229 KB)
- Chapter 9 - List of Preparers (PDF – 43 KB)
- Chapter 10 - List of Acronyms (PDF – 229 KB)
- Chapter 11 - Glossary (PDF – 61 KB)
- Chapter 12 - Index (PDF – 46 KB)
- Chapter 13 - Literature Cited (PDF – 229 KB)
Appendices
- Appendix A - Alternative Route Maps (2002 Aerial Photographs) (PDF -24.3 MB)
- Appendix B - Distribution of the DEIS (PDF – 25KB)
- Appendix C - Agency Correspondence (PDF – 25.6 MB)
- Appendix D - Soils Information (PDF -219 KB)
- Appendix E - Plants Identified Along US 31 Alternatives (PDF – 128 KB)
- Appendix F - Plants, Fishes, Reptiles, Amphibians, Mammals, Birds, Reported in St. Joseph and Marshall Counties (PDF – 20 MB)
- Appendix G - Wetland, Habitat, & Trophic Response Guilds for Vertebrates in Indiana (PDF – 10.3 MB)
- Appendix H - Wetland Memorandum of Understanding (PDF – 1.39 MB)
- Appendix I - Archaeological Records Check and Phase 1a Field Reconnaissance (PDF – 23 MB)
- Appendix J - Traffic Noise Analysis (PDF – 3.5 MB)
- Appendix K - AD 1006 and NRCS-CPA-106 Farmland Conversion Impact Rating Forms (PDF – 1.03 MB)
- Appendix L - DEIS Comments & Responses (PDF – 617 KB)
- Appendix M - Aquatic Data Sheets (PDF – 170 KB)
- Appendix N - Conceptual Wetland Mitigation Plan (PDF – 2.37 MB)
- Appendix O - Survey of Bats Along Route 31 Marshall/St. Joseph Counties, Indiana (PDF – 1.15 MB)
- Appendix P - Section 106 Documentation (PDF – 3.18 MB)
- Appendix Q - Cost Estimate (PDF – 2.41 MB)
- Appendix R - Preliminary Muck and Peat Soils Information (PDF – 1.7 MB)
- Appendix S - US 20/US 31 Interchange for Preferred Alternative G-Es (PDF – 3.02 MB)
- Appendix T - Section 404(b) (1) (LEDPA) Consistency Analysis (PDF – 687 KB)
- Appendix U - Floodplain Risk Assessment Forms (PDF – 1.83 MB)
PREFERRED ALTERNATIVE MITIGATION PACKAGE
- Table of Contents (PDF - 98K)
- Chapter 1 - Introduction (PDF - 206K)
- Chapter 2 - Description of Non-Preferred Alternaitves (PDF - 721K)
- Chapter 3 - Description of Preferred Alternatives (PDF - 956K)
- Chapter 4 - Summary of Comments (PDF - 136K)
- Chapter 5 - Permits (PDF - 56K)
- Chapter 6 - Summary of Proposed Mitigation (PDF -104K)
- Chapter 7 - Conclusion (PDF -45K)
Appendices
DRAFT ENVIRONMENTAL IMPACT STATEMENT
- Table of Contents (PDF - 98K)
- Executive Summary (PDF - 256K)
- Chapter 1 - Project Introduction (PDF - 215K)
- Chapter 2 - Purpose and Need (PDF - 48K)
- Chapter 3 - Alternatives (PDF - 1.7MB)
- Chapter 4 - Affected Environment (PDF - 2.6MB)
- Chapter 5 - Environmental Consequences (PDF - 2.1MB)
- Chapter 6 - Mitigation (PDF -111K)
- Chapter 7 - Draft Section 4(f) Evaluation (PDF -355K)
- Chapter 8 - Public Outreach, Comments and Coordination (PDF -106K)
- Chapter 9 - List of Preparers (PDF -59K)
- Chapter 10 - List of Acronyms (PDF -40K)
- Chapter 11 - Glossary (PDF -84K)
- Chapter 12 - Index (PDF -70K)
- Chapter 13 - Literature Cited (PDF -65K)
Appendices
- Appendix A (PDF - 1.2 MB)
- Appendix B (PDF - 325K)
- Appendix C (PDF - 4.3MB)
- Appendix D (PDF - 121K)
- Appendix E (PDF - 204K)
- Appendix F ( PDF - 2.2MB)
- Appendix G (PDF - 737K)
- Appendix H (PDF - 68K)
- Appendix I (PDF - 1.5MB)
- Appendix J (PDF - 1.2MB)
- Appendix K (PDF - 372K)
PRELIMINARY ALTERNATIVES ANALYSIS AND SCREENING REPORT (08/19/03)
- Executive Summary (PDF - 395K)
- Chapter 1 - Introduction (PDF - 694K)
- Chapter 2 - Screening Measures (PDF - 48K)
- Chapter 3 - Development of Corridor Alternatives (PDF - 146K)
- Chapter 4 - Screening of Alternatives (PDF - 2MB)
- Chapter 5 - Preliminary Alternatives Eliminated from Further Consideration (PDF - 176K)
- Chapter 6 - Preliminary Alternatives to be Carried Forward for Further Analysis in DEIS (PDF -163K)
Appendices
- Appendix A - (PDF - 1.1MB)
- Appendix B - (PDF - 128K)
- Appendix C - (PDF - 122K)
- Appendix D - (PDF - 691K)
- Appendix E - (PDF - 308K)
PURPOSE AND NEED STATEMENT
Purpose and Need Statement (PDF - 34K)
NOTICE OF INTENT
LIST OF MEETINGS
Initial Scoping Meetings
- Community Advisory Committee Meeting - March 21, 2002
- Public Information Meeting - March 21, 2002
Purpose and Need/Preliminary Alternatives
- Community Advisory Committee Meeting - April 10, 2003
- Public Information Meeting - April 10, 2003
- Interagency Review Meeting and Project Tour - May 15, 2003
Preliminary Alternatives Analysis and Screening Report
- Community Advisory Committee Meeting - September 4, 2003
- Public Information Meeting - September 4, 2003
- Interagency Review Meeting - September 30, 2003
Section 106 – Historic and Archaeological Resource Process
- Consulting Party Meeting - Resource Identification - June 6, 2003
- Consulting Party Meeting - Eligibility Determination - September 4, 2003


